Hi Everyone
It is that time of year where I see what I have achieved, if anything. So, or should that be sew, lets get to it………
Firstly – Material bought but not cut up yet
Stonehenge Quilt – not started (next on list)
Flower/Season Quilt – not started
Bear Quilt – not started
Forest Creatures Quilt – not started – I made one block as a prototype. Going to try this as a Log Cabin variation.
Angel Quilt – not started
Peacock Quilt – not startedStitch Fabric – not started
Secondly – Quilts in the process of being made
Seaside Quilt – started – no further progress
Stag Quilt – started – some more blocks completed and sewn togetherSewing Quilt – cut up ready to start
Christmas Quilt – started – top row completed and sewn together – middle section and side panel blocks completed
Rose Window Quilt – started – top of quilt completed – awaiting removal of paper piecesHearts in a Square Dance – started – no more progress
Ring-A-Roses Quilt – started – four rounds completed , started fifth round (this is a hexagon quilt)
Memoirs Quilt – started – Left side panel blocks completed, started middle section and now half right section completed
Nashville Quilt – COMPLETED and with recipient (My Husband)
Thirdly Quilts awaiting Hand Quilting or Machine Quilting
Pirate Quilt – Outside panels quilted, centre panel quilted and rope quilting still in process on sandy areas
Seasonal Quilt – sandwiched and pin basted ready to start quilting
Jazz Quilt – sandwiched and pin basted ready to start quilting
Daybreak Lap Quilt – Completed and gifted to my best friend.
Flower Fairy Lap Quilt – quilted awaiting binding
Snoopy Quilt – Completed
Winnie the Pooh Lap Quilt – not started yet
Safari Quilt – Pin basted ready for quiltingTiled Quilt – sandwiched and pin basted
Sewing Quotation Lap Quilt – COMPLETED
Jane Austen – Pride and Prejudice Cross Stitch Quilt – Top completed, basted ready for quilting
Bee Hive Quilt – by Gail Pan – Completed top, wadding cut to size but backing material needs sewing together as it is a pieced back and then it will be ready for quilting
Cross Stitch
Lady Greensleeves – Completed awaiting going to Picture Framers
Sophia Loren – about 1/2 finished
John Wayne – not started
Snow Queen – prepared but not started
Whinnie the Pooh (Christmas Gift) – not started
Celtic Bell Pull – started
Long Stitch
Spring – completed
Summer – started
Red Work (new project)
Red work Basket Quilt – prepared and started hand sewing the first redwork basket as well as pieced three blocks together and two more semi prepped
Red work Fox – prepared ready to sew
KnittingFancy stitch knitted scarf – Started with colour green
Well I think that two projects have moved along to a different pile and one project is completed. One new project off to a flying start.
No wonder my mind is frazzled sometimes, but then again I like to have more than 1 project on the go at the same time. Ha! A busy year ahead still!!
Daisy
WOW ~ you really have accomplished quite a bit – way to go! here’s to a great 2nd half of the year. (hard to believe were half way thru again)
LikeLike