Yearly Round-up for 2022

Well last year seems to have flown by and now I need to take stock of my achievements over the past year. Not that I am going to beat myself up for not completing something! Finishing the Nashville Quilt for my husband is the priority and also Sophia Loren.

Firstly – Material bought but not cut up yet

Stonehenge Quiltnot started (next on list)

Flower/Season Quilt – not started

Bear Quilt – not started

Forest Creatures Quilt – not started

Angel Quilt – not started

Peacock Quilt – not started

Stitch Fabric – not started

Secondly – Quilts in the process of being made

Seaside Quilt – started – no further progress

Stag Quilt – started – some more blocks completed and sewn together

Sewing Quilt – cut up ready to start

Christmas Quilt – started – top row completed and sewn together – middle section and side panel blocks completed

Rose Window Quilt – started – top of quilt completed – awaiting removal of paper pieces

Hearts in a Square Dance – started – no more progress

Ring-A-Roses Quilt – started – four rounds completed , started fifth round (this is a hexagon quilt)

Jane Austen – Pride and Prejudice Cross Stitch Quilt – started – centre piece finished, side panel blocks started

Memoirs Quilt – started – Left side panel blocks completed, started middle section

Bee Hive Quilt – started – Left side panel completed, Right side started

Nashville Quilt – started – top of quilt completed – awaiting removal of paper pieces

Thirdly Quilts awaiting Hand Quilting or Machine Quilting

Pirate Quilt – Outside panels quilted, centre panel quilted and rope quilting still in process on sandy areas

Bee on Lavender Quilt – sandwiched and pin basted ready to start quilting

Seasonal Quilt – sandwiched and pin basted ready to start quilting

Jazz Quilt – sandwiched and pin basted ready to start quilting

Daybreak Lap Quilt – Completed and gifted to my best friend.

Flower Fairy Lap Quilt – quilted awaiting binding

Snoopy Quilt – Completed

Winnie the Pooh Lap Quilt – not started yet

Safari Quilt – not started yet Tiled Quilt – sandwiched and pin basted

Sewing Quotation Lap Quilt – completed

Cross Stitch

Lady Greensleeves – Completed awaiting going to Picture Framers

Sophia Loren – about 1/2 finished

John Wayne – not started

Snow Queen – prepared but not started

Whinnie the Pooh (Christmas Gift) – not started

Celtic Bell Pull – started

Long Stitch

Spring – completed

Summer – started

Red Work (new project)

Red work Basket Quilt – prepared two blocks for sewing

Red work Fox – prepared ready to sew

Wow 38 projects – 4 completed so far. No wonder my mind is frazzled sometimes, but then again I like to have more than 1 project on the go at the same time. Ha! A busy year ahead!!

Well that’s me done. Take care and stay safe

Daisy

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s