Well last year seems to have flown by and now I need to take stock of my achievements over the past year. Not that I am going to beat myself up for not completing something! Finishing the Nashville Quilt for my husband is the priority and also Sophia Loren.
Firstly – Material bought but not cut up yet
Stonehenge Quilt – not started (next on list)
Flower/Season Quilt – not started
Bear Quilt – not started
Forest Creatures Quilt – not started
Angel Quilt – not started
Peacock Quilt – not started
Stitch Fabric – not started
Secondly – Quilts in the process of being made
Seaside Quilt – started – no further progress
Stag Quilt – started – some more blocks completed and sewn together
Sewing Quilt – cut up ready to start
Christmas Quilt – started – top row completed and sewn together – middle section and side panel blocks completed
Rose Window Quilt – started – top of quilt completed – awaiting removal of paper pieces
Hearts in a Square Dance – started – no more progress
Ring-A-Roses Quilt – started – four rounds completed , started fifth round (this is a hexagon quilt)
Jane Austen – Pride and Prejudice Cross Stitch Quilt – started – centre piece finished, side panel blocks started
Memoirs Quilt – started – Left side panel blocks completed, started middle section
Bee Hive Quilt – started – Left side panel completed, Right side started
Nashville Quilt – started – top of quilt completed – awaiting removal of paper pieces
Thirdly Quilts awaiting Hand Quilting or Machine Quilting
Pirate Quilt – Outside panels quilted, centre panel quilted and rope quilting still in process on sandy areas
Bee on Lavender Quilt – sandwiched and pin basted ready to start quilting
Seasonal Quilt – sandwiched and pin basted ready to start quilting
Jazz Quilt – sandwiched and pin basted ready to start quilting
Daybreak Lap Quilt – Completed and gifted to my best friend.
Flower Fairy Lap Quilt – quilted awaiting binding
Snoopy Quilt – Completed
Winnie the Pooh Lap Quilt – not started yet
Safari Quilt – not started yet Tiled Quilt – sandwiched and pin basted
Sewing Quotation Lap Quilt – completed
Cross Stitch
Lady Greensleeves – Completed awaiting going to Picture Framers
Sophia Loren – about 1/2 finished
John Wayne – not started
Snow Queen – prepared but not started
Whinnie the Pooh (Christmas Gift) – not started
Celtic Bell Pull – started
Long Stitch
Spring – completed
Summer – started
Red Work (new project)
Red work Basket Quilt – prepared two blocks for sewing
Red work Fox – prepared ready to sew
Wow 38 projects – 4 completed so far. No wonder my mind is frazzled sometimes, but then again I like to have more than 1 project on the go at the same time. Ha! A busy year ahead!!
Well that’s me done. Take care and stay safe
Daisy