Half Yearly Round-Up 2022

Hello Everyone

Well the year has flown by and we are in full swing with celebrating our Queen’s Platinum Jubilee. (I hope she can feel the love and respect we have for her).

As the title of this post suggests I am going to review my progress as such and see what needs my attention. If you remember I posted about various projects and their status at the end of last year (Post called Round Up 2021 ) and below is a reminder with their current status highlighted in Bold Itallic.

I eventually received my “STITCH” fabric which was delayed because of the pandemic, transport etc etc! So that is awaiting a start as well.

I have made a list of all the quilts that are awaiting being cut up ready to patchwork, prepped ready to start and awaiting quilting.

Material bought but not cut up

Bee Hive Quilt – cut up and started to sew together

Stonehenge Quilt – not started

Flower/Season Quilt – not started

Bear Quilt – not started

Forest Creatures Quilt – not started

Angel Quilt – not started

Cowboy Quilt – (Nashville Quilt) – cut, pieced and sewn together 2/3rd’s almost completed.

Parrot Heart Quilt – not started

Quilts in the process of being made

Seaside Quilt – started – no more progress

Stag Quilt – started – some more blocks completed and sewn together

Sewing Quilt – cut up ready to start

Christmas Quilt – started – 2 more blocks made

Rose Window Quilt – started – no more progress

Hearts in a Square Dance – started – no more progress

Ring-A-Roses Quilt – started – no more progress

Jane Austen – Pride and Prejudice Cross Stitch Quilt – started – centre finished

Quilts awaiting Hand Quilting

Pirate Quilt – started quilting – outside border quilted, rope quilting in process, one corner quilted and centre panel quilted.

Bee on Lavender Quilt – sandwiched and pin basted ready to start quilting

Seasonal Quilt – awaiting quilting – no progress

Jazz Quilt – awaiting quilting – next one to start

Daybreak Lap Quilt – awaiting quilting – quilted, and gifted to my best friend.

Flower Fairy Lap Quilt – awaiting quilting – started and half is now quilted

Snoopy Quilt – quilted awaiting binding

Winnie the Pooh Lap Quilt – not started yet

Safari Quilt – not started yet

Tiled Quilt – awaiting quilting – no progress

On the Cross Stitch front – the same has happened

I have finished “Teacups” cross stitch

WIP – Lady Greensleeves – is now completed

WIP – Sophia Lorenhave started and main face area completed

WIP – Robin Table Runner – no progress

PDF Downloads – Modern Folk Embroidery SAL 2021 – this is downloaded and ready to roll – have started this and completed January and nearly done February

PDF – John Wayne – not started – no progress

No further action on any of the others listed below

Longstitch Designs of Seasonal Flowers – Spring is done.

Seasonal Flower Cross Stitch (Spring, Summer Autumn Winter) none started

Small Projects – some work on Bookmarks

Other Sewing Projects

2 x Cushions completed

Needle Cases

Pin Cushions

Pot of Treats

Well still a long way to go. Must get stitching,

Bye for now

Daisy x

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s